Recent Projects

Projects in Progress

Renovation Works to install Cathlab in SQUH – Muscat
Modification Work of Mammography at Nizwa Hospital
Pre – Installation Work for Core Lab at SQUH Alkhoudh – Phase I and Phase II
Supply and Installation of Fire Alarm System for BMT-Clean Room at SQUH – Al Khoudh
Supply and Installation of CCTV System for BMT-Clean Room at SQUH – Al Khoudh
Proposed Mammography & Ultrasound at Diwan Royal Court Bausher
Pre-Installation Work for Clean Room at SQUH – Alkhoud
Pre-Installation works to be done for Fluoroscopy at Salalah Hospital
Pre Installation and Decoration work of MRI Suit at Salalah Hospital.
Fit-out work for Royaloak Showroom in Sharjah Central Mall – UAE

Completed Projects

Pre Installation of Fluoroscopy, Khoula Hospital
Pre Installation of X-ray, Khoula Hospital
Pre Installation of X-ray, Al Nahda Hospital
Pre Installation of Cath Lab, Khoula Hospital
Pre Installation and Interior Décoration of CT, SQUH
Pre Installation and Modification of Cath Lab, SQUH
Pre-Installation Work to be done for CT Room at Royal Hospital.
Shielding works to be done for CT Room at SQUH – Al Khoud.
Supply of Warning Lamp
CT Pre-Installation works for Suwaiq, Khasab
Pre-Installation works to be done for Fluoroscopy at Suwaiq, Khasab, Salalah Hospital
Supply and Installation of Access Panels for CT Room at Suwaiq & Khasab Hospital
Supply and Installation of Stainless Steel, Threshold at SQUH.
Supply and Installation of Lead Lined Wooden Swing Door at SQUH
Supply and Installation of Lead Glass at AFH – Alkhoud.
Fit-out work for Royaloak Showroom at RAK Mall – Ras Al Khaimah – UAE
Fit-out work for Royaloak Showroom at Silicon Central Mall – DSO – UAE
Fit-out work for Royaloak Showroom at LULU Mall Fujairah – UAE
Modification of Lead Lined Door for CT Room at Rustaq Hospital.
Pre-Installation work for BMT Building at SQUH – Alkhoud
Design and Modification in Radiology Department to Create a a Nuclear Medicine Section and intergrate with New Building in Block 8, Level 1 in SQUH.
Pre Installation work for CT Room at AFH, Al Khoud
Electrical, Network, Drainage, Water and Compressed Air Work for ROP Lab Area – B1, Ghala Heights.
Pre-Installation work for CSSD at Royal Hospital
Modification work for OT at Khoula Hospital
Maintenance work for PG Center at Khoula Hospital
Supply and Installation of Metallic Door Frame for Al – Jarda Health Center,Al Mudaibi
Pre-Installation work for Mammography Room at Rustaq Hospital.
Pre-Installation work for X-ray Machine at Al Qabil Health Center
Pre-Installation of Cath Lab and associated work at, Sur Hospital
Pre-installation of MRI Suite, Sur Hospital
Pre-Installation of Fluoroscopy, Khoula Hospital
Pre-Installation of X-ray, Khoula Hospital
Pre-Installation of X-ray, Al Nahda Hospital
Pre-Installation of Cath Lab, Khoula Hospital
Pre-Installation and Interior Décoration of CT, SQUH
Pre-Installation and Modification of Cath Lab, SQUH
Pre-installation of MRI Suite, Khoula Hospital
Structural work for Cath Lab, Sur Hospital
Modification work for X-Ray Room, Khoula Hospital
Pre-Installation work of Hologic New 3 Dimensions Mammography System – Khoula Hospital
Replacement of Connecting Door to Defence Hospital and VVIP Wing
Pre-Installation work for X-ray Room, SQUH, Al Khoud
Pre-Installation for CT Room at Max Care Hospital, Salalah
Pre-Installation for New X-ray Machine at Taqah Hospital, Salalah
Supply and Installation of Lead lining sheet for X-ray Room, Al-Jarda Health Center Al Mudaibhi
Modification work for Female hand Surgery Ward at Khoula Hospital

Completed Major Projects

As Sub Contractor to Al Zinad/Muscat Pharmacy
Pre-Installation Work for MRI, (2 No) New ROP Hospital, Muscat
Pre-Installation work for MRI, (3 No) SQUH, Al Khoud
Pre Installation work for MRI, Nizwa Hospital
Pre Installation work for MRI, Sohar Hospital
Pre Installation work for Kims Hospital, Muscat.
Pre Installation work for CT Al Nahda Hospital
Pre Installation work for CT (2 NO) SQUH, Al Khoudh
Pre Installation work for Cath Lab, Khoula Hospital
Pre Installation and Interior Decoration of CT, SQUH
Pre Installation work for Cath Lab, SQUH, Al Khoudh
Pre Installation work for Fluoroscopy, SQUH, Al Khoud
Pre Installation work for Fluoroscopy, Khoula Hospital
Pre Installation work for Cath Lab, Aster Hospital, Sohar
Pre Installation work for X-Ray Al Nahda Hospital, Muscat
Pre installation work for X-Ray, Khoula Hospital
Radiation Sheilding for AFH, Al Khoudh
Radiation Shielding for Cancer Care and Research Centre, Al Khoud.
As Sub Contractor to Al Zinad/Muscat Pharmacy
Pre installation of MRI Suite, Khoula Hospital
Lead lining for Modular O.T., ROP Hospital

Sub Contract Works

Radiation shielding for Cancer Center
Lead ling for Modular O.T., ROP Hospital

As Sub Contractor to Al Zinad/Muscat Pharmacy
Pre Installation Work for MRI, (2 No) New ROP Hospital, Muscat
Pre Installation work for MRI, (3 No) SQUH, Al Khoud
Pre Installation work for MRI, Nizwa Hospital
Pre Installation work for MRI, Sohar Hospital
Pre Installation work for Kims Hospital, Muscat.
Pre Installation work for CT Al Nahda Hospital
Pre Installation work for CT (2 NO) SQUH, Al Khoudh
Pre Installation work for Cath Lab, Khoula Hospital
Pre Installation work for Cath Lab, SQUH, Al Khoudh
Pre Installation work for Fluoroscopy, SQUH, Al Khoud
Pre Installation work for Cath Lab, Aster Hospital, Sohar
Pre Installation work for X-Ray Al Nahda Hospital, Muscat
Radiation Sheilding for AFH, Al Khoudh
Radiation Shielding for Cancer Care and Research Centre,
Al Khoud.

PRE-INSTALLATION AND RADIATION SHIELDING OF PROJECTS RELATED TO HOSPITALS

Sr. No.

Name of Work

Client

1

Pre-Installation work of MRI

S.Q.U.H

2

Pre-Installation of X ray Unit,

Qurum

R.O.P

3

Pre-Installation of X ray unit

Al Nahda Hospital

4

Pre-Installation of MRI

Kims Hospital

5

Pre-Installation of MRI, for

Waleed Pharmacy

Khoula Hospital

6

Pre-Installation MRI and CT (2

each)

S.Q.U.H

7

Radiation Shielding, CCCC

Cancer Center (RCA)

8

Radiation Shielding AFH

RCA

9

Pre installation MRI

Royal Hospital

10

Pre Installation of MRI

Sohar Hospital

11

Pre Installation of MRI

Nizwa Hospital

12

Pre Installation of Cathlab

Nizwa Hospital

13

Pre Installation of Cathlab

Sohar Hospital

14

Pre Installation of Cathlab

Khoula Hospital

15

Pre Installation MRI

ROP New Hospital

16

Pre Installation XRAY

ROP New Hospital

17

Cath lab and Office

Aster Al Raffah Sohar

18

Cath Lab Modification

SQUH